How Long Does It Take for Concrete Driveway to Dry?

Answer

Concrete driveway can take about 7 days to a month to dry. However, you should not allow it to dry immediately. This is because concrete needs time to set before drying. You can do this by watering it with a hose because drying it for moisture.
1 Additional Answer
Ask.com Answer for: how long does it take for concrete driveway to dry
How Long Does it Take for a Concrete Driveway to Dry?
The amount of time a new driveway needs in order to cure or dry properly ranges from seven days to a month, depending on the thickness of the concrete, weather conditions and the weight of your vehicles. Curing concrete refers to the steps taken in the... More »
Difficulty: Easy
Source: www.ehow.com
Q&A Related to "How Long Does It Take for Concrete Driveway..."
A concrete driveway will dry overnight, If you do it in the morning, give it about 7 hours. This may vary up or down according to how much water to concrete was mixed initially.
http://answers.ask.com/Business/Other/how_long_doe...
In addition to not using the surface, curing involves maintaining the right temperature and moisture level so the hardening crystals in the concrete will react with the cement. Wait
http://www.ehow.com/info_8620507_long-concrete-dri...
1. Soak up any excess stain substance by pouring cat litter over it. Sweep up and discard the saturated cat litter and apply another layer of litter to soak up any remaining stain
http://www.ehow.com/how_6979188_do-clean-concrete-...
1. Sprinkle cat litter over the antifreeze stain - cover the stain completely. Wear work gloves to keep the litter smell off your hands. Let the cat litter sit on the stain overnight
http://www.ehow.com/how_7394836_antifreeze-off-con...
Explore this Topic
The time for a new concrete base to dry out is estimated at one day per 1mm thickness of concrete up to 50mm. Greater thicknesses need significantly longer to ...
The drying of a concrete floor depends on the atmospheric conditions and the mix design. A thick slab that has been allowed to dry from only one side usually requires ...
Concrete generally reaches approximately 90% of its final strength after three weeks. This strengthening may continue for decades as the calcium hydroxide converts ...