Web Results

www.fhwa.dot.gov/engineering/hydraulics/pubs/hec/hec11sI.pdf

4.5 Material Quality. 4.6 Edge Treatment. 4.7 Construction. Chapter 5 : HEC 11 Rock Riprap Design Procedure. 5.1 Preliminary Data Analysis. 5.2 Rock Sizing ( Form 1). 5.3 Revetment Details. 5.4 Design Examples. 5.4.1 Example Problem #1 . 5.5.2 Example Problem #2. Chapter 6 : HEC 11 Guidelines for Other Revetments.

www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs144p2_025594.pdf

Design Guide MD#6 Riprap Design Methods. NRCS Engineering, Maryland. January, 2004. Page 2. Maryland Department of Transportation, State Highway Administration. Standard Specifications for Construction Materials. 901.02.01 Stone for Riprap. Class of. Riprap. Size in Weight. Approximate. Diameter. Percent.

onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_568.pdf

Riprap Design Criteria,. Recommended Specifications, and Quality Control. NATIONAL. COOPERATIVE. HIGHWAY. RESEARCH. PROGRAM. NCHRP. REPORT 568 ...

www.usbr.gov/tsc/techreferences/hydraulics_lab/pubs/PAP/PAP-0790.pdf

initial guidelines for designing steep riprap slopes subjected to overtopping. Additional test data from 1997 have been incorporated into this previous work allowing verification of initial design guidelines. Input from embankment dam designers has prompted investigation into simplification of the initial guidelines into a more ...

www.env.gov.bc.ca/wsd/public_safety/flood/pdfs_word/riprap_guide.pdf

Riprap Design and. Construction Guide. Public Safety Section. Water Management Branch. Province of British Columbia. Ministry of Environment, Lands and Parks. March 2000 ...

www.usbr.gov/tsc/techreferences/hydraulics_lab/pubs/PAP/PAP-0809.pdf

RIPRAP DESIGN FOR OVERTOPPED EMBANKMENTS. The flood potential at a dam and the resulting likelihood of dam failure must be evaluated as part of the design flood selection process. The design flood must be selected before requirements for additional spillway capacity or overtopping protection can be designed.

www.iaea.org/inis/collection/NCLCollectionStore/_Public/14/751/14751616.pdf

NUREG/ CR-2684. PNL-4252. 1-. Rock Riprap Design Methods and their Applicability to. Long-Term Protection of. Uranium Mill Tailings Impoundments. Prepared by W. H. Walters. Pacific Northwest Laboratory. Operated by. Battelle Memorial Institute. Prepared for. U.S. Nuclear Regulatory. Commission ...

pubs.usgs.gov/wri/1986/4128/report.pdf

ROCK RIPRAP DESIGN FOR PROTECTION OF STREAM. CHANNELS NEAR HIGHWAY STRUCTURES. VOLUME 2 ~ EVALUATION OF RIPRAP DESIGN PROCEDURES. By J.C. Blodgett and C.E. McConaughy. U.S. GEOLOGICAL SURVEY. Water-Resources Investigations Report 86-4128. Prepared in cooperation with.

www.deq.virginia.gov/Portals/0/DEQ/Water/StormwaterManagement/Erosion_Sediment_Control_Handbook/Chapter%203%20-%203.19.pdf

Wherever soil and water interface and the soil conditions, water turbulence and velocity, expected vegetative cover, etc., are such that the soil may erode under the design flow conditions. Riprap may be used, as appropriate, at stormdrain outlets, on channel banks and/or bottoms, roadside ditches, drop structures, at the toe ...